Having observed the trend of the semiconductor industries requiring more affordable equipment and the potential of the gas stick fabrication, Regiontec recently invested and opened it's newest cleanroom facility within their workshop.
This new cleanroom is classified and certified to 3 type of class,
Area#1: Class 100, 9.6m 2
Area#2: Class 1000, 4.8m 2
Area#3: Class 10,000, 14.4m2
As more tools are being moved in and install in a very short turnover period, the request for external fabrication of "Plug and Play" gas sticks are on the rise.
Regiontec Gas sticks are fabricated according to approved materials and components by the customer. All assembly are pressure / Leak tested, delivered in vacuum internal bag and sealed in a larger external bag to prevent contamination.
By purchasing ready made gas sticks, the installation team can better manage their installation schedule and not waste time doing assembly.
Regiontec has over 40 years of collective experience in installation and commissioning of different types of Gas distribution equipment through out Asia like;
With such experience in abundance, it's normal that the next progression is to fabricate it's own Gas equipment.
Particularly for our Gas cabinet and Valve Manifold Box, it has gone through and obtain Semi S2 certification issued by TUV.
Most of our staff came from an environment where designing and building new equipment to cater to the ever changing environment that is the semiconductor industries, is a norm.
We provide design and work with local authorities or Professional Engineers to get new facilities or installation approved for use.